Meet the engineers, technicians, and operators designing and building Relativity Space’s launch site at Cape Canaveral Space Force Station.
Teams at the Cape are responsible for designing, constructing, and activating the systems required to launch Terran R including launch pad infrastructure, fluids systems, electrical power, instrumentation, controls, vehicle integration, and more.
Chapters
0:00-0:55 Launch team overview
0:56 –1:20 Data & controls engineering
1:21 – 1:42 Launch operations
1:43 – 2:02 High power & electrical systems
2:03 – 2:32 Launch fluids systems
2:33 – 3:17 Team collaboration
3:18 – 3:53 Careers in launch operations at the Cape
3:54-4:38 Preparing for Terran R’s first launch
Stay Connected
🚀Terran R
🚀Careers
Teams at the Cape are responsible for designing, constructing, and activating the systems required to launch Terran R including launch pad infrastructure, fluids systems, electrical power, instrumentation, controls, vehicle integration, and more.
Chapters
0:00-0:55 Launch team overview
0:56 –1:20 Data & controls engineering
1:21 – 1:42 Launch operations
1:43 – 2:02 High power & electrical systems
2:03 – 2:32 Launch fluids systems
2:33 – 3:17 Team collaboration
3:18 – 3:53 Careers in launch operations at the Cape
3:54-4:38 Preparing for Terran R’s first launch
Stay Connected
🚀Terran R
🚀Careers
Comments 0
Be the first to comment!